Involved ripping up old teak teak replacing under-deck structure
with new framework and covering with 5mm 5052 grade checkerplate.
Involved ripping up old teak teak replacing supporting structure
with new framework and covering with 5mm 5052 grade checkerplate.
Original ladder was pinned into the teak deck creating a point for eventual failure of water-tight integrity. Replacement ladd was welded suspended above deck level.
Our mobile truck is fitted with a crane that can lift 2.5 tonnes with a reach of 5 metres making difficult access points much easier.
We have everything required for your repair on-board and ready to weld
Using the latest rare earth technology, our generator requires no electronics, and therefore nothing to break down.
Stray sinkers can cause pitting in the keels of aluminium boats
Mobile crane makes easy work for welding upside down
Both TIG and MIG welders roll out on platforms. MIG is fitted with a 10m extension for easy access deep inside vessel
We carry Argon, Argon/CO2 portable cylinders which we refill from our larger gas cylinders using our custom built decanting system.
We manufactured new bollards from Aluminium using solid bar
Stainless bow rail was bent out of shape and required replacement.
Note that all this welding was performed on site at the mooring.
Difficult welding position.
The bridge console was widened from a centre console to full width allowing much more space for instruments